| DATES |
PROJECTS |
INSTRUMENTS SUPPLIED |
2004
-present |
Marquette Interchange Project
Illinois- USA |
Vibrating Wire Load Cells
Vibrating Jack-out Pressure Cells
Inclinometer Casing
Digital Inclinometer System
Field Services |
2003
-present |
1-5 SB Plantable Geosynthetic Reinforced Wall,
California - USA |
60 ELS Biaxial In-place Inclinometers
140 Vibrating Wire Total Earth Pressure Cells
16 Vibrating Wire Push-in Type Piezometers
5 Data Loggers
Inclinometer Casing
Field Services |
1994
-present |
Taejon Test Tunnel
- Korea |
Extensometers
Packer Piezometers
Thermistors Strings |
1993
-present |
Checkerboard Creek BC Hydro
- Canada |
Multiple Point Borehole Extensometers
In-place Inclinometers
Data Loggers |
1980
-present |
Trans Alta Utilities
- Canada |
Pneumatic Piezometers
Earth Pressure Cells |
| 2005 |
Caltrans – State Routes 880/262
Applied Solutions Consultants
State of California - USA |
Vibrating Wire Piezometers
Single Channel Vibrating Wire Dataloggers
4 Channel Data Loggers
Hydraulic Overflow Settlement Cells
Field Services |
| 2005 |
State Highway 130,
Texas - USA |
84 Vibrating Wire Settlement Cells
84 Vibrating Wire Drive Point Piezometers
22 Casagrande Standpipe Piezometers |
| 2004-2005 |
Greater Vancouver Regional District, Highway 10 & 15 - Canada |
Deep Settlement Gauge
Settlement Plates
Inclinometer Casing
Pneumatic Piezometers |
| 2004 |
Border Infrastructure Program
Surrey BC - Canada |
Casagrande Standpipe Piezometers
Push-in Pneumatic Piezometers
Inclinometer Casing
Magnetic Settlement System |
| 2003 |
President George Bush Turnpike Highway Project
Texas - USA |
Vibrating Wire Piezometers
Vibrating Wire Settlement Cells & accessories
Vibrating Wire Terminal Stations
Inclinometer Casing |
| 2003 |
CP Rail: Roger's Pass
- Canada |
ELS Tilt Meters
Load Cells
Dataloggers |
| 2002 |
MTR - Hong Kong
C-615 Po Lam Station
C-506(A) Mei Foo
C-603 Black Hills Tunnel |
Vibrating Wire Piezometers
Extensometers
Piezometers
Tilt Meters
Data Loggers
Inclinometers
Load Cells
Blast Monitoring |
| 2002 |
KCRC West Rail Contracts - Hong Kong
C-601 West Rail Depot Kam Tim
C-400 Tai Wai Station
C230 Tin Shui Wai - Tuen Mun
C-404 Mei Foo Station |
Inclinometer System
Horizontal Inclinometer
Vibrating Wire Piezometers
ELS Tilt Sensors
ELS In-place Inclinometer
Data Loggers
GeoViewer Software
Vibrating Wire Displacement
Transducers |
| 2001 |
Lam Construction
- Hong Kong |
Vibrating Wire Piezometers
Rain Gauges
Time Domain Reflectometery |
| 2001 |
Eastern Harbour Tunnel
- Hong Kong |
Settlement Profile Monitoring System
Real-Time Data Acquisition System
Crack Meters |
| 2000 |
Seoul Subway Corporation
- Korea |
Tunnel Profile Monitoring System |
| 2000 |
Highways Hong Kong Contract
- Hong Kong |
Remote Monitoring Data Acquisition System
Vibrating Wire Piezometers
In-place Tilt Sensors
Strain Gauges
Load Cell
Data Loggers |
| 2000 |
Hong Kong Airport
- Hong Kong |
Pneumatic Piezometers
Settlement Systems
Inclinometer Casing |
| 2000 |
Bakun
- Philippines |
Measurement Of Power Tunnel Lining Diameter Under 5.24Mpa Water Pressure |
| 2000 |
Petronas, Kota Kinnabalu
- Malaysia |
Horizontal inclinometer |
| 2000 |
Tseung Kwan O Building Development
- Hong Kong |
Fully instrumented large diameter bored pile load test
Strain Gauge
Rod Extensometer
Load Test |
| 2000 |
MTRC Rail Extension,
Tseung Kong O Lin
- Hong Kong |
Extensometer
Inclinometer System |
| 2000 |
Tung Hu Slope Monitoring Project
- Taiwan |
Borehole Loggers
Inclinometer System
Piezometers |