Submersible Tilt Meter
NOTE: This is a legacy and discontinued product not available for order.
The RST Submersible Tiltmeter provides precision real-time remote monitoring of tilt of submerged structures.
Overview
NOTE: This is a legacy and discontinued product not available for order.
The RST Submersible Tiltmeter provides precision real-time remote monitoring of tilt of submerged structures. It consists of a MEMS inclinometer sensor and electronics mounted inside a rugged waterproof enclosure. The instrument housing is machined from solid stainless steel, providing extreme endurance for long-term high-pressure underwater service. The cable entry is a submarine grade connector, which provides watertight performance at depths exceeding 200 meters.
SUBMERSIBLE TILT METER SPECIFICATIONS
ITEM | SPECIFICATION |
Range | ±30° |
Resolution | (±0.0002°) (0.04 mm/m)¹ |
Sensor Precision | ±0.0013° (0.02 mm/m)¹ |
Sensor Precision | ±0.0005°(0.01 mm/m)² |
Sensor 24hr Stability | ±0.03 mm/m¹ |
Sensor 24hr Stability | ±0.01 mm/m² |
Sensor | MEMS Accelerometer |
Temperature Dependent Uncertainty | ±0.016 mm/m/°C (±0.001°/°C), for ±5° from vertical |
Temperature Dependent Uncertainty | ±0.033 mm/m/°C (±0.002°/°C), for ±15° from vertical |
Temperature Accuracy | ±0.5 °C (0 °C to 60 °C) |
Temperature Accuracy | ±1.0 °C (-40 °C to 60 °C) |
Temperature Resolution | 0.06 °C |
Operating Temperature | -40 to 80 °C (-40 to 175°F) |
Dimensions | ø28.6mm x 211mm (ø1.125” x 8.31”) |
¹: 99% Confidence Interval
²: 68% Confidence Interval
Submersible Tilt Meters are commonly used for:
- Observation of benches and berms in open pit mines.
- Monitoring of tilt of retaining walls, piles, and bridge piers.
- Monitoring of offshore structures.
- Installation of submerged pipelines.
Speak with an Expert
I’m very happy with the quality of the instrumentation and technical support from RST, as always. They worked with us from the initial stages of the project to ensure that we were fully prepared and equipped to use the RSTAR network for the first time. They delivered everything within the tight project time frame to ensure that there were no delays on site, and the submersible tilt meters looked like new even after over twelve months of being submerged in Thames water!
-Richard Lipscombe, BEng (Hons), Director & Principle Consultant - RL Geotechnical Ltd